As a SimOps platform, how to earn replies in Aerospace
.png)
Aerospace inboxes are full. Generic AI and digital twin claims get ignored. What earns replies is a message that sounds like an internal program note, ties to 1 measurable outcome, and removes risk in the first scroll. This post gives you a practical plan you can run this week.
Who this is for
SimOps founders and revenue leaders selling into European aerospace programs across airframe, systems, MRO, and test.
Outcomes that make buyers care
Aim every first touch at 1 of these program level goals
- Reduce physical tests by 20% to 50%
- Cut energy per test run by 10% to 30#
- Shorten time to decision in design of experiments by 30% to 50%
Explain the outcome in the buyer’s language. Name the program or system when it is public, and state the metric you want to move.
Build the right account list
Prioritise enterprises where a reply can become a meeting
- Size 5,000 plus employees or multi program operations
- Visible modelling and simulation footprint in talks, papers, or roles
- ERP and PLM in place so decisions use real constraints
- Safety, compliance, and verification themes in public goals
Map the buying group
Reach at least 3 people in every account
- VP or Director R&D or Engineering
- Head of program or verification
- Digital or data leader
- Operations or manufacturing leader
- Procurement and security reviewer
Message framework that works
One outcome plus one proof plus one small ask
- Outcome choose tests, energy, or time to decision
- Proof show SOC 2 or a respected accelerator or consortium
- Small ask request a 15 minute mapping call with a 2 point agenda
Example one line
Operate existing models with ERP and PLM context to cut physical tests and keep decisions auditable.
Copy you can use today
Subject ideas
- Reduce physical tests in program name this quarter
- Faster trade off studies with your current models
- Lower energy per run using ERP and PLM context
Email opener
Name
A quick idea to reduce physical tests in program name without slowing validation. We connect existing models to ERP and PLM so decisions reflect real constraints. Two outcomes to discuss energy reduction and faster design of experiments. Open to a 15 minute mapping chat next week
Call opener
The fastest aerospace wins we see are fewer tests and faster design of experiments using current data. If either is live I can walk through a 2 minute workflow and outline next steps.
LinkedIn opener
Noticed your note on verification and validation. We help teams operationalise approved models so non specialists can run studies as a simple app. Open to compare approaches
Sequence that respects aerospace calendars
Day 1 email plus connect
Day 3 call and leave a 30 second voicemail that repeats the small ask
Day 7 reply to your own email with a 1 line update and a slot
Day 10 send a 2 minute workflow capture using their current tool names
Day 14 reach a second persona with a tailored outcome
Handle the 3 common objections
Security review
Share a 2 page security brief and confirm reuse of identity and access rules.
We already have tools
Confirm you connect their stack and add ERP and PLM context so decisions reflect real constraints.
Proof before pilot
Agree on 1 metric tests, energy, or time to decision and outline the workflow on call 1.
Metrics to track
• Reply rate 5% to 10% on targeted lists
• First meeting rate 2% to 4% of contacted accounts
• Second meeting conversion 50% to 70% when you show a concrete workflow